FROM OUR ARCHIVE
3D visualisations of real venues
The model first, the event after it. Each frame is a 3D visualisation made by PWR Production for a real venue; open it to watch the video.







01 / 06
Step 1: visit and survey
We visit the venue and measure it, so the model matches the real space to scale: terraces, façades, gardens, levels and access routes.

02 / 06
Step 2: the venue in 3D
The venue is rebuilt as a to-scale 3D model. Every later decision, from stage position to speakers, lighting and guest layout, is made against it.

- Truss and ground-support towers: Prolyte / Global Truss.
- LED wall: Absen / Infiled, hung from the beam; processing Novastar, video switching Blackmagic.
- Sound: L-Acoustics line arrays, coverage simulated in Soundvision.
- Light: moving lights previsualised in Depence.
- The deck sits in the model at its real position and height.
- Six long tables in two blocks of three, with a central aisle.
03 / 06
Step 3: design inside the model
- Decor and guest layout.
- Stage, structures and sightlines.
- Sound system: where the L-Acoustics speakers stand, how they blend into the setup and how the coverage looks in Soundvision.
- Lighting design in Depence and how it integrates with the architecture.

- Plan: six long tables in two blocks with a central aisle.
- Plan: the truck route and the unloading zone are checked on the same drawing.
- Front elevation: LED wall (Absen / Infiled) on hoists from the beam, arrays at both sides.
- Moving lights under the beam, previsualised in Depence.
- Side elevation: one array is visible, the other is behind it; coverage checked in Soundvision.
- The coverage rays reach the last row of tables; the level at the boundary is checked in Soundvision.
DayNight04 / 06
Step 4: day and night
Light changes everything. In 3D, with the lighting previsualised in Depence, you can see the same space from daylight to nightfall, something a site visit cannot show.

05 / 06
Step 5: approval before installation
The client sees the finished result before the installation begins. Changes at this stage are quick and inexpensive compared with changes on site.

06 / 06
Step 6: build it for real
After approval the model becomes the build plan. At Château de la Croix des Gardes we built a wedding twice, first in 3D and then in reality, and we have both results side by side.

- Empty courtyard: the starting point, taken from the survey.
- Deck, towers and beam in place (Prolyte / Global Truss).
- LED wall (Absen / Infiled) and L-Acoustics arrays hung from the beam.
- The show: moving lights (Depence) and evening light on the same structure.
VENUES



